top of page
West Ryde 16.2kW
PROJECT SUMMARY: Our client's factory consumed an average daily power draw of 70kWh. Due to the fact that operational hours are exclusively during daylight hours, this slightly oversized system will cover the bulk of the electricity load. Optimisation of the shade affected areas was applied to maximise output.
IMG_20180622_094557
IMG_20180622_095353
IMG_20180622_094719
bottom of page