Concord 20kW
PROJECT SUMMARY: In order to accommodate the considerable power demands of this palatial water front property, all of the available roof space needed to be utilised. The installed system will produce an average of 80kWh a day. As this project was installed during the property's construction phase, the non-penetration roof installation was completed in 3 stages around the building contractors. Solid scheduling and care was taken by our team to ensure a smooth installation timeline.