PROJECT SUMMARY:  The client required approximately 60kWh of base load power per day to operate their large pump and water systems. Prior to the implementation of the Solar Power System, these pumps were run at night. This was revised post installation to utilise the power being produced by the solar. Due to the adaptability of the power draw, Sungen Solar has been successful in reducing the daily grid consumption from 60kWh to less than 20kWh.   

PROJECT AT A GLANCE
SYSTEM SIZE
14.25kW
MODULES
50 x 285 Longi Panels
INVERTERS
Huawei 3 Phase Inverter